Senior Electrical Commissioning Engineer - Data Center Construction

Los Angeles, CA
Full Time
Commissioning
Experienced

Lead the Systems That Power Critical Infrastructure 

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution. 
 
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments. 

Why This Role Stands Out 

This is not a checklist-driven commissioning role. 
 
This is a position for someone who: 
• Owns outcomes, not just tasks 
• Understands systems holistically, not in silos 
• Can operate independently while leading others 
 
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions. 

What You’ll Do 

Project Leadership & Execution 
• Lead commissioning activities across the full project lifecycle 
• Execute and oversee functional testing, factory witness testing, and on-site validation 
• Manage multiple assignments while maintaining schedule, budget, and quality expectations 
• Interpret contract documents to identify risks and opportunities 
 
Technical Expertise & Problem Solving 
• Evaluate electrical distribution systems and building system interconnectivity 
• Troubleshoot system performance issues in real time 
• Review design documentation and submittals 
 
Client & Stakeholder Engagement 
• Lead commissioning meetings and communicate findings 
• Serve as a trusted partner to clients and contractors 
 
Operational Contributions 
• Complete field reports, documentation, and time management 
• Support scheduling and revenue targets 
 
Team Development 
• Mentor junior engineers and support training initiatives 

What You Bring 

Core Qualifications 
• Electrical Engineering degree or Qualified Electrician background 
• 7+ years in electrical systems OR 3+ years commissioning 
• Data center or mission-critical experience 
 
Technical Capabilities 
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation 
• Ability to read construction drawings and specifications 
 
Professional Skills 
• Strong analytical and communication skills 
• Ability to lead meetings and manage multiple priorities 
 
Physical Requirements 
• Ability to work in field environments, climb ladders, and lift ~30 lbs 
 
Preferred 
• EIT, CEM, LEED, OSHA 30, BIM experience 

Travel Requirements 

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required. 

Why FST 

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles

Salary range: $130,000 to $180,000

Share

Apply for this position

Required*
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

To comply with government Equal Employment Opportunity and/or Affirmative Action reporting regulations, we are requesting (but NOT requiring) that you enter this personal data. This information will not be used in connection with any employment decisions, and will be used solely as permitted by state and federal law. Your voluntary cooperation would be appreciated. Learn more.

Invitation for Job Applicants to Self-Identify as a U.S. Veteran
  • A “disabled veteran” is one of the following:
    • a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or
    • a person who was discharged or released from active duty because of a service-connected disability.
  • A “recently separated veteran” means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
  • An “active duty wartime or campaign badge veteran” means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
  • An “Armed forces service medal veteran” means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
Veteran status



Voluntary Self-Identification of Disability
Voluntary Self-Identification of Disability Form CC-305
OMB Control Number 1250-0005
Expires 07/31/2029
Why are you being asked to complete this form?

We are a federal contractor or subcontractor. The law requires us to provide equal employment opportunity to qualified people with disabilities. We have a goal of having at least 7% of our workers as people with disabilities. The law says we must measure our progress towards this goal. To do this, we must ask applicants and employees if they have a disability or have ever had one. People can become disabled, so we need to ask this question at least every five years.

Completing this form is voluntary, and we hope that you will choose to do so. Your answer is confidential. No one who makes hiring decisions will see it. Your decision to complete the form and your answer will not harm you in any way. If you want to learn more about the law or this form, visit the U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) website at www.dol.gov/ofccp.

How do you know if you have a disability?

A disability is a condition that substantially limits one or more of your “major life activities.” If you have or have ever had such a condition, you are a person with a disability. Disabilities include, but are not limited to:

  • Alcohol or other substance use disorder (not currently using drugs illegally)
  • Autoimmune disorder, for example, lupus, fibromyalgia, rheumatoid arthritis, HIV/AIDS
  • Blind or low vision
  • Cancer (past or present)
  • Cardiovascular or heart disease
  • Celiac disease
  • Cerebral palsy
  • Deaf or serious difficulty hearing
  • Diabetes
  • Disfigurement, for example, disfigurement caused by burns, wounds, accidents, or congenital disorders
  • Epilepsy or other seizure disorder
  • Gastrointestinal disorders, for example, Crohn's Disease, irritable bowel syndrome
  • Intellectual or developmental disability
  • Mental health conditions, for example, depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD
  • Missing limbs or partially missing limbs
  • Mobility impairment, benefiting from the use of a wheelchair, scooter, walker, leg brace(s) and/or other supports
  • Nervous system condition, for example, migraine headaches, Parkinson’s disease, multiple sclerosis (MS)
  • Neurodivergence, for example, attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia, other learning disabilities
  • Partial or complete paralysis (any cause)
  • Pulmonary or respiratory conditions, for example, tuberculosis, asthma, emphysema
  • Short stature (dwarfism)
  • Traumatic brain injury
Please check one of the boxes below:

PUBLIC BURDEN STATEMENT: According to the Paperwork Reduction Act of 1995 no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. This survey should take about 5 minutes to complete.

You must enter your name and date
Human Check*